Reserve Study Tutorial #3
Reserve Component Life and Cost Estimates
Once a reserve component has been identified the
following must be determined for each component:
 |
 |
Useful Life |
 |
Remaining Useful Life |
 |
Current Replacement
Cost |
|
|
 |
|
After this information is recorded during the site
inspection, it is verified or refined through research with the
association’s vendors or other experts. Once all of an association’s
reserve components are identified and their life and cost estimates
determined a financial analysis can be performed.
|